Berkley Road Water Treatment Plant Expansion
Auburndale, Florida
ChastainSkillman | DCCM provided topographic survey and design services for the expansion of the Berkley Road Water Treatment Plant.
ChastainSkillman | DCCM provided surveying and water/wastewater engineering for the expansion of the Berkley Road Water Treatment Plant.
The project scope included two components: 1) public water supply well and 2) wellhead appurtenances, site piping, and water treatment plant improvements.
Services include:
The Topographic Survey consisted of an approximately 6-acre portion of the Berkley Road Water Treat Plant for the expansion of the capacity of the plant. The survey included the survey of an existing ground storage tank, existing wells, and fencing for the site.
ChastainSkillman | DCCM partnered with Biller Reinhart Engineering Group, Inc. for structural engineering, Madrid Engineering Group, Inc. for geotechnical engineering, J.H. Ham Engineering, Inc.for electrical engineering, and Verdantas LLC for hydrogeological services for this project.